This project involved the installation of three utilities: a 63mm gas main, 63mm water main, and dual electric supplies (95mm and 185mm).


The gas and water works were completed using standard installation methods with no significant challenges. In contrast, the electrical installation was more complex. Prior to works commencing, UK Power Networks (UKPN) undertook reinforcement works to enable the new connection.


The project was located in an affluent and high-footfall area of London. Due to the busy footpath and restricted working space, the team carried out approximately 43 metres of hand digging to safely install the ducting while minimising disruption.


A further challenge involved installing the low-voltage (LV) cable along a constrained route into a below-ground basement, requiring careful planning and precision.



Despite these complexities, the project was delivered on time and to a high standard.


Latest News

February 18, 2026
Services: New Electric TBS/Mains and Services Client: Formation Design & Build Location: Muswell Hill, London
February 11, 2026
Services: New MP Gas Main, Service, Meter and Outlet Client: Veolia Location: Shrewsbury
January 28, 2026
Services: New Gas & Water Services Client: Glencar Location: London