Case Study: Hans Place
Services: Gas, Water & Electric
Client: TSL Refurbishment Limited
Location: London
This project involved the installation of three utilities: a 63mm gas main, 63mm water main, and dual electric supplies (95mm and 185mm).
The gas and water works were completed using standard installation methods with no significant challenges. In contrast, the electrical installation was more complex. Prior to works commencing, UK Power Networks (UKPN) undertook reinforcement works to enable the new connection.
The project was located in an affluent and high-footfall area of London. Due to the busy footpath and restricted working space, the team carried out approximately 43 metres of hand digging to safely install the ducting while minimising disruption.
A further challenge involved installing the low-voltage (LV) cable along a constrained route into a below-ground basement, requiring careful planning and precision.
Despite these complexities, the project was delivered on time and to a high standard.