Case Study: Shrewsbury April 2026
Services: Gas
Client: Veolia
Location: Shrewsbury
We successfully delivered a new 63mm medium-pressure (MP) gas service to supply a U160 gas meter housed within a GC6 kiosk, overcoming a range of technical and logistical challenges.
The point of connection (POC) was located approximately 150 metres from the site, requiring open-cut excavation across an industrial roadway, followed by trenching along the verge and into the client’s premises.
The project was further complicated by legal and access constraints, including securing permissions for road crossings, managing easement agreements, and coordinating works across land owned by a third party.
Through careful planning, stakeholder engagement, and strict adherence to regulatory requirements, we were able to complete the installation safely and efficiently, delivering a reliable medium-pressure gas supply while minimising disruption to the surrounding area.