Conrad Energy Developments, Bridgewater

Jan 04, 2023

Our long-standing client Energy Assets requested us to install a new medium pressure gas main and service for the global energy giants, Conrad Energy. This was to feed their new energy centre. The works included all off-site excavation works and pipe install along with a new bespoke meter and kiosk installation on site. 


You might also like

Latest News

28 Nov, 2022
We have been asked to carry out site wide remedial works on 26 of the buildings at MOD Woodbridge. This is one of many bases that we have carried remedial works on across the UK. The work package included making the 26 buildings compliant to gas safety regulations by removing medium pressure installations from inside the building and repositioning new external meter positions and regulators. We worked closely with the client and the MOD to make sure all works were carried out to a high standard and all security protocols were followed. 
19 Aug, 2022
We were approached by our client who had requested an elevated load to cater for an additional distillation column at their chemical recycling plant. This work package included installing 900m of 315mm MP Gas Main and obtaining a bespoke meter and kiosk. This new supply will be gassed up via a complex connection onto the existing 500mm PE MP Main.
More Posts
Share by: