Case Study: Montpelier

Adrian Johnson • February 6, 2025

Services: Electrical Infrastructure

Client: Livin Construction

Location: West London

For our Montpelier project, we installed a 300mm waveform cable across the road to the site boundary, reducing it down to 95mm to supply plots 1 and 2. Additionally, a 95mm run was installed on-site, extending towards plots 3 and 4. All properties were provided with 3-phase services due to their size.


The project was for the construction of four luxury homes in W5, London, with a value of £9.6m. One of the key challenges was the lack of available parking bays. Despite placing no-parking cones, they were frequently moved, and vehicles continued to park, making the installation process more difficult.


SSEN completed the Point of Connection (POC) to energise the supply, while UKPD served as the adopting Independent Distribution Network Operator (IDNO).


Latest News

By Adrian Johnson • April 22, 2026
Services: Gas Client: Veolia Location: Shrewsbury
By Adrian Johnson • April 8, 2026
Services: Gas, Water & Electric Client: TSL Refurbishment Limited Location: London
By Adrian Johnson • February 18, 2026
Services: New Electric TBS/Mains and Services Client: Formation Design & Build Location: Muswell Hill, London