Case Study: Veolia Liverpool

March 13, 2025

Services: Gas

Client: Veolia

Location: Liverpool

This project involves installing a 355mm/250mm PE MP Main and service from the 500mm MP Cadent network main located 868m away from site, terminating in a bespoke kiosk with a 102m MP meter.


The carriageway excavation was completed under two-way traffic light control throughout the project to ensure safety and minimise disruption to residents.


The specialist 500mm x 300mm MP branch saddle was undertaken by Radius. 



All works are to be backfilled and reinstated once the Gas Meter has been commissioned, so our client can commission his new development.