Case Study: Former Honda Site
Services: Gas Mains & Services
Client: Matrix
Location: Swindon
Argon was commissioned to install a new Medium Pressure (MP) gas network to supply ten commercial units within a private development. Argon connected to the existing MP main and installed 2,568m of new MP gas main in line with the client’s approved design, completing excavation and reinstatement within 1 metre of the connection point.
Argon then installed 10 Medium pressure gas services, each fitted with a Fire Valve and ECV, and supplied 2 bespoke kiosks, 7 GRP kiosks and 1 Uni Box. Ten concrete plinths were constructed to support the kiosks. All works were fully tested and certified, delivering a safe and compliant gas infrastructure system ready for commercial use.