Case Study: Lydden Road

December 18, 2025

Services: Removal of Gas Mains & Electric Civils

Client: VIQR London

Location: London

Argon was commissioned to remove a redundant gas main located within a public footpath. The works involved excavating approximately 90 metres, breaking out and disposing of the existing pipe.

The scope also included the excavation of two joint pits to facilitate UKPN operations, along with the exposure of five electrical ducts, which were subsequently relocated into the void created by the removed gas main. Upon completion, the footpath was fully backfilled and reinstated, and the site was handed back to the client with all works completed.